How much is a CBR 600 worth?
Values
Suggested List Price | Low Retail | |
---|---|---|
Base Price | $11,799 | $8,715 |
Options (Add) | ||
Total Price | $11,799 | $8,715 |
How much is a Repsol motorcycle?
Honda CBR150R Repsol Special Edition
Name | Honda CBR150R Repsol Special Edition |
---|---|
Body Type | Sport Bike |
Price | P155,000 |
What is CBR of soil?
CBR is the ratio expressed in percentage of force per unit area required to penetrate a soil mass with a standard circular plunger of 50 mm diameter at the rate of 1.25 mm/min to that required for corresponding penetration in a standard material. The ratio is usually determined for penetration of 2.5 and 5 mm .
What is the main drawback of CBR method?
Main drawback of CBR method is that it. Does not consider the strength characteristics of sub-grade soil. Is a complex method. Gives the total thickness which remains the same irrespective of the quality of materials used in the component layers.
What is effective CBR of soil?
❑ EFFRCTIVE CBR ▪ Composite strength of the subgrade and the embankment soil below it is termed as EFFECTIVE CBR. ▪ This composite strength should be taken for design consideration ▪ This composite strength should be taken for design consideration rather than strength of top 500mm.
What is effective CBR value?
CBR 75% is the maximum permitted value for Effective Subgrade Strength. For the formula to hold, the maximum permissible Equivalent Subgrade Strength is CBR 12%
Why CBR test is important?
The california bearing ratio test is penetration test meant for the evaluation of subgrade strength of roads and pavements. The results obtained by these tests are used with the empirical curves to determine the thickness of pavement and its component layers.
What is soaked CBR value?
CBR is a penetration test used for evaluating the mechanical strength of subgrade soil and for determining the thickness of the pavement required. Determination of soaked and unsoaked CBR value for a soil is time consuming and a laborious process.
What is the minimum CBR value for subgrade?
➢The sub-base material should have minimum CBR of 20% for cumulative traffic up to 2 msa and 30% for traffic exceeding 2 msa. ➢The material should be tested for CBR at the dry density and moisture content expected in the field.