What does future work mean?
Future work concerns deeper analysis of particular mechanisms, new proposals to try different methods, or simply curiosity.
What is future research directions?
A future research direction is the direct and fair comparison of methods like SDP, DDP and MCA solving the same problem.
What is future research scope?
Answer: The scope of a study explains the extent to which the research area will be explored in the work and specifies the parameters within the study will be operating. Basically, this means that you will have to define what the study is going to cover and what it is focusing on.
What is scope and limitation of research?
The limitations of the study refers to the shortcomings of the study – things you believe the research lacked or ways in which it could have been better. Other differences are that scope and delimitations are established before starting the study, while limitations are describing after completing the study.
What is the difference between scope and limitation of the study?
Scope identifies all of the things which the research can range over; limitations identify the boundaries, i.e., those things which are beyond scope.
What is the purpose of scoping in EIA?
The purpose of scoping is to identify: the important issues to be considered in an EIA; the appropriate time and space boundaries of the EIA study; the information necessary for decision-making; and the significant effects and factors to be studied in detail.
What is the first step in EIA?
Screening is the first stage of the EIA process which results in a key EIA decision, namely to either conduct the assessment (based on the likely significant impacts) or not conduct it (in the anticipated absence of such impacts).
What does EIA 2020 mean?
draft Environment Impact Assessment
What is the main goal of EIA?
The main aim of EIA is to conserve the environment and bring out the best combination of economic and environmental costs and benefits.
What are the advantages and disadvantages of EIA?
Strengths & Weaknesses of EIA
- Strength: Boosts Efficiency of Project. EIA helps the overall efficiency of the project.
- Strength: Versatile Application Range. EIA can be applied to nearly any major project.
- Strength: Improves Public Relations.
- Weakness: Relies on Technical Inputs.
- Weakness: Costly Time Delays.
- Weakness: Requires Preparation and Follow-Up.
What are the benefits of EIA?
The Benefits of Environmental Assessment
- Reduced cost and time of project implementation.
- Cost-saving modifications in project design.
- Increased project acceptance.
- Avoided impacts and violations of laws and regulations.
- Improved project performance.
- Avoided treatment/clean up costs.
What is the problem in EIA 2020?
Problems in the EIA 2020 draft Violates Freedom of speech & expression: Time to raise public opinion has been reduced from 30 days to 20 days. Moreover, the draft was put out at a time when a public hearing was least possible due to the nation-wide lockdown owing to Covid-19 pandemic.
What are the changes in EIA 2020?
The EIA Notification 2020 excludes reporting by the public of violations and non-compliance. Instead, the government will take cognisance of reports only from the violator-promoter, government authority, Appraisal Committee or Regulatory Authority.