Top countries producing geothermal power
- US. With an installed capacity of 3,639MW in 2018, the US is the leading producer of geothermal energy across the world, producing 16.7 billion kilowatt hours (kWh) of geothermal energy throughout the year.
- Indonesia.
- Philippines.
- Turkey.
- New Zealand.
- Mexico.
- Italy.
- Iceland.
How much land does a geothermal power plant need?
An entire geothermal field uses 1-8 acres per megawatt (MW) versus 5-10 acres per MW for nuclear operations and 19 acres per MW for coal power plants. Coal power plants also require huge acreages for mining their fuel.
How long can a geothermal power plant last?
Geothermal systems are built to last a very long time. “The indoor components typically last about 25 years (compared with 15 years or less for a furnace or conventional AC unit) and more than 50 years for the ground loop,” The Family Handyman magazine reports.
How much does it cost to run a geothermal power plant?
The capital cost for a geothermal power plant is about $2,500 per kilowatt (kW), whereas operation and maintenance costs range from $0.01 to $0.03 per kWh. Tax incentives and various forms of financing are often used to offset costs of developing a geothermal power project.
Where is the best location for geothermal energy?
The most active geothermal resources are usually found along major tectonic plate boundaries where most volcanoes are located. One of the most active geothermal areas in the world is called the Ring of Fire, which encircles the Pacific Ocean.
Can geothermal plants be built anywhere?
Unfortunately, geothermal power plants can’t be built anywhere. Geothermal reservoirs above 100°C are usually necessary for most large geothermal plants, and these reservoirs are only found in specific locations, usually near tectonic plate boundaries or hot spots.
Why is geothermal not widely used?
High capital costs are usually main stumbling block for new geothermal power projects. According to 2010 data the estimated costs of geothermal power plant construction and well drilling are at €2-5 million per generated MW of electricity.
Why are geothermal power plants bad?
But it has some environmental problems. The main concern is the release of hydrogen sulfide, a gas that smells like rotten egg at low concentrations. Another concern is the disposal of some geothermal fluids, which may contain low levels of toxic materials.