How much did Mile High Stadium cost?

How much did Mile High Stadium cost?

Empower Field at Mile High

Construction
Opened August 11, 2001
Construction cost $400.9million ($623 million in 2020 dollars)
Architect HNTB Fentress Architects Bertram A. Burton and Associates
Project manager ICON Venue Group

When was Mile High stadium built?

1968

Is Mile High Stadium heated?

Sports Authority Field at Mile High has measures in place to keep the game running smoothly in harsh weather conditions. The stadium is equipped with a drainage system and an underground heating system to heat the sand that the turf sits on.

Can I bring a blanket to an NFL game?

Fans will be able to bring blankets by tossing them over a shoulder or arm. They can be easily screened carrying a blanket into the stadium.

Can you bring food into Mile High Stadium?

THE FOLLOWING ITEMS ARE PERMITTED INTO THE STADIUM: Food of any kind that is contained in a clear plastic bag. Non-alcoholic beverages in a factory-sealed bottle, however frozen drinks (water, etc) are not permitted.

Is Mile High allowing fans?

Due to a variance issued by the state in September, the Broncos had been allowed to host a maximum of 5,700 fans for home games against Tampa Bay, Kansas City and the Los Angeles Chargers. The decision by the Broncos to stop inviting fans to Mile High comes when positive tests continue to spike locally and state-wide.

How much is parking at Mile High Stadium?

If you plan to park in the Mile High Stadium parking lots, you can expect to pay between $20 and $60. The closest stadium parking lot is 3120 Mile High Stadium Circle which goes for $60 for parking on game day. If you are driving an RV to the game, you can use parking lots M and N to park.

How many seats does Mile High Stadium have?

76,125

What is the largest stadium in the world?

Rungrado 1st of May Stadium

Begin typing your search term above and press enter to search. Press ESC to cancel.

Back To Top