How much does a 10 story building cost?
Office, 5-10 Story Square Foot Cost Assuming Face Brick with Concrete Block Back-up / R/Conc. Frame
| Cost Estimate (Open Shop) | % of Total | Cost |
|---|---|---|
| Total | $9,229,500 | |
| Contractor Fees (GC,Overhead,Profit) | 25% | $2,307,400 |
| Architectural Fees | 6% | $692,200 |
| Total Building Cost | $12,229,100 | |
What are building costs per square foot in Bangladesh?
From my knowledge, I can help you a little. First, There is a thumb-rule for construction cost in Bangladesh. 2200~2300 BdT per Square feet. You can find an estimated value from here.
How much does it cost per square foot to build a pole barn?
Pole Barn Cost The total cost per square foot ranges from $20 to $35. Materials average $15 to $25 per square foot. Add an additional $5 to $10 per square foot for professional labor. Post frame builds do not have a foundation.
How much does a building cost in Bangladesh?
First, There is a thumb-rule for construction cost in Bangladesh. 2200~2300 BdT per Square feet.
How much money does it take to build a house in Bangladesh?
2 Katha of land can be more than enough to build a house in Bangladesh. However, be ready to spend anywhere between a few Lac to a few Crore per Katha in Dhaka! The current going rate for land per Katha in Mirpur starts from 25 Lac.
How much money is needed to build a building?
Contrary to C class, it would take on an average, Rs 10-11 lakh to complete a B class house, measuring 1,000 sq ft. A Class: Such type of construction involves the use of best resource quality, and therefore, the cost of constructing a house measuring 1,000 sq ft, may vary between Rs 15-25 lakh.
Is it cheaper to build a garage or buy a kit?
Cost Effective Garage kits are often less expensive than prebuilt garages. There are many options available, and it’s easy to find the garage that best suits your home and budget when you go with a kit. Because you will be doing all of the labor, there is, of course, no labor fees.