What is an AIA Agreement?

What is an AIA Agreement?

An AIA contract, which stands for American Institute of Architects contract, is designed to protect the interest of architects when hired to work on a construction project.

What is Ejcdc?

EJCDC stands for Engineers Joint Contract Documents Committee. It is a coalition of stakeholders in the project delivery process who develop and endorse quality contract documents and encourage their use through education and promotion.

What is the purpose of the general conditions of the contract?

The general conditions are an integral part of the contract for construction for a large project and they are incorporated by reference into the owner/contractor agreement. They set forth the rights, responsibilities, and relationships of the owner, contractor, and architect.

What are the construction contract documents?

Construction “Contract Documents” are the written documents that define the roles, responsibilities, and “Work” under the construction Contract, and are legally-binding on the parties (Owner and Contractor). Common examples of vagueness in this regard include phrases such as, “the Contract Documents…

What are the three basic types of documents used in construction contracts?

The essential part of the contract documents.

  • 10 Documents Must Be Included on Every Construction.
  • 4 Common Types of Construction Contracts. Construction documents include all building plans, specifications, and supporting documents used during the completion of a construction project.

What are the steps in the construction process?

What are the 6 steps of a construction process?

  1. Conception (aka planning and development) Planning and development, sometimes called project conception, is the very beginning of the construction process.
  2. Design.
  3. Preconstruction.
  4. Procurement.
  5. Construction.
  6. Post construction.

What are the construction process?

The ‘construction process’ (sometimes called the ‘construction stage’) is the physical processes of building, landscaping or refurbishing plus all the associated activities, such as demolition, site clearance, administration and so on. The following processes can form part of the construction process: Mobilisation./span>

What is a program of works in construction?

Most construction contracts require the contractor to produce a programme of works. This can be a non-contractual reference point for how work will be carried out or it can impose obligations to deliver the works in a certain way and by certain dates./span>

What are the activities involved in building construction?

  • Paper Work. Construction of residential building required paper work before the start of actual construction.
  • Marking of Layout.
  • Excavation.
  • Foundation Work.
  • Column Casting.
  • Construction of Walls.
  • Lintel.
  • Roofing.

What is a method statement in construction?

Method statements are documents that detail exactly how to carry out work safely. When it comes to ensuring building site health and safety, method statements are key. The purpose of method statements is to describe the safety precautions to put in place to control risks identified in the risk assessment.

What is a specification in construction?

Specifications describe the products, materials and work required by a construction contract. They do not include cost, quantity or drawn information, and so need to be read alongside other information such as quantities, schedules and drawings./span>

What are the types of specification in construction?

There are two types of specifications.

  • General Specifications.
  • Detailed Specifications.

What are the types of specifications?

Four Types of “Specifications”

  • Product Specification: This describes a manufacturer’s product and its performance without consideration for a particular building.
  • Project Specification: This describes an architect’s design and performance requirements for a particular building.
  • Master Specification:
  • Guide Specification:

What are plans and specifications?

Your house plans are a set of scaled drawings that show contractors what they are building. Your specifications (or specs) are a written document that details what materials will be used and how to install things./span>

How do you read a plan and specs?

The Basics: How to Read Architectural Plans

  1. Be organized and diligent when reading plans. Start in upper left corner and work way across page so as not to miss any details.
  2. Read the plan cover sheet.
  3. There are often reference points that are used between professionals and sets of drawings.
  4. Review the plan index which provides a list of all plan sheets.

Do specs override drawings?

If there is a conflict between the Drawings and Details on Drawings and the Specifications, then the Specifications will prevail. The higher “Order of Precedence of Documents” governs or prevails. This only works if you have a CONFLICT NOT AN OMMISSION.

What is the difference between construction drawings and specifications?

Specifications will detail the materials, standards, techniques, and so on required to carry out the works. Construction drawings provide the graphical representation, indicating the arrangement of components, detailing, dimensions, and so on.vor 5 Tagen

Do drawings supersede specifications?

Supplement Design Build Contract-Order of Precedence, which showed that specifications took precedence over concept drawings. General requirements, which stated “in case of differences between project specifications and the accompanying drawings, the specifications will govern.”/span>

What is the relationship between the working drawings and the specifications?

Working drawings and specifications are the primary working documents used by a contractor to bid and execute a project. Specifications are the written documents that go with the construction documents and describe the materials as well as the installation methods.

What is the purpose of a specification in construction?

Let’s look at the main reasons why the specification is so important to the construction process: It provides clear instructions on the intent, performance and construction of the project. It can reference the quality and standards which should be applied. Materials and manufacturers’ products can be clearly defined.

What are the contract documents and why are they so important?

A written contract gives ample protection on the parties involved when the agreed terms or conditions are not followed or are breached. When a party to an agreement breaks the contract, the written agreement will be used as a general reference on what the parties have agreed and determine who is really at fault./span>

What are the main components of a project specification?

The primary components of a project management plan are:

  • Scope Statement.
  • Critical Success Factors.
  • Deliverables.
  • Work Breakdown Structure.
  • Schedule.
  • Budget.
  • Quality.
  • Human Resources Plan.

What are the elements of test specifications?

Test specifications usually include a test description component and a test blueprint component. The test description specifies aspects of the planned test such as the test purpose, the target examinee population, the overall test length, and more.

What is the importance of test specifications?

The test specifications for an exam program provide essential planning materials for the test development process. Thorough, thoughtful test specifications can guide the remainder of the test development process, especially item writing efforts and test assembly.

What is a table of specification in test construction?

The table of specifications (TOS) is a tool used to ensure that a test or assessment measures the content and thinking skills that the test intends to measure. Thus, when used appropriately, it can provide response content and construct (i.e., response process) validity evidence./span>

Why a specification is needed when designing a good test?

A crucial part of software & system test document, test design specification specifies the test conditions for a test item, the detailed test approach, and identifies the associated high level of test cases. The main objective of this document is to specify which the test suites and test cases to run and which to skip./span>

Begin typing your search term above and press enter to search. Press ESC to cancel.

Back To Top